Hyundai Matrix service from 2002 to 2006 of release
1. Operation and car maintenance
2. Engine
2.1. Maintenance
2.2. Mechanical part (engine of 1,6 l)
2.3. Mechanical part (engine of 1.8 l)
2.3.1. Adjustment of a tension of a belt of a drive of GRM
2.3.2. Adjustment of a belt of a drive of hinged units
2.3.3. Removal, check and installation of camshafts
2.3.4. Check and gap adjustment in a drive of valves
2.3.5. Dismantling, check and assembly of a cranked shaft
2.3.6. Removal, check and installation of a flywheel (MKPP) or plate of a drive of the hydrotransformer (AKPP)
2.3.7. Dismantling and assembly of shatunno-piston group
2.3.8. Dismantling, check and assembly of a head of the block of cylinders
2.3.9. Removal, check and installation of a belt of a drive of the mechanism of a gazoraspredeleniye
2.4. Cooling system
2.5. Greasing system
2.6. Power supply system
2.7. Control system, fuel system and system of decrease in toxicity
2.8. Tables
3. Transmission
4. Running gear
5. Steering mechanism
6. Brake system
7. Onboard electric equipment
8. Body
9. Electric equipment schemes
 









2-3-1-regulirovka-natyazheniya-remnya-privoda-grm.html

2.3.1. Adjustment of a tension of a belt of a drive of GRM

Lift the car by means of a podkatny jack.
Slowly turn a steering wheel at first clockwise, then counter-clockwise.

NOTE
Considerable resistance to turn should not be felt.


Fig. 2.87. Arm of a lateral support of the engine


Remove an arm of a lateral support of the engine (fig. 2.87).
Remove a pulley of the pump of cooling liquid.

Fig. 2.88. Top cover of a belt of a drive of GRM


Remove the top cover of a belt of a drive of GRM (fig. 2.88).
Remove spark plugs.
Bring the cylinder No. 1 piston in VMT of a step of compression, having turned a cranked shaft of the engine clockwise.

NOTE
Never turn a cranked shaft counter-clockwise for combination of labels as it can lead to the wrong tension of a belt of a drive of GRM.


Fig. 2.89. Contour of a belt of a drive of GRM


Weaken a bolt of sharnirny fastening and an adjusting bolt of an arm of a roller of a natyazhitel (fig. 2.89).
Turn a cranked shaft of the engine clockwise so that the asterisk of a camshaft turned on 2 teeth.

NOTE
Camshaft turn in situation at which its cams do not press yokes of final valves, is necessary for creation of the correct tension of a belt.

Check that normal gearing of a belt of a drive of GRM with asterisks (each tooth of a belt on an asterisk is located in a flute) is provided.

Fig. 2.90. Tightening of a bolt of sharnirny fastening of a roller of a natyazhitel


Tighten at first an adjusting bolt, then tighten a bolt of sharnirny fastening of a roller of a natyazhitel (fig. 2.90).
Check a tension of a belt of a drive of GRM.
Establish spark plugs.
Establish the top cover of a belt of a drive of GRM.
Establish a pulley of the pump of cooling liquid and an arm of a lateral support of the engine.

«previous page
2.3. Mechanical part (engine of 1.8 l)
following page»
2.3.2. Adjustment of a belt of a drive of hinged units